How we install a new roof?
-

-

-
The Hill's story
-
1. The old roof is completely removed and
disposed.
-
2. The sheathing is inspected for previous
water damage or dry roof root and replaced with new lumber.
-
3. 30 LB. shake liner is applied.
-
4. Galvanized pipe vent and W-valley flashing
are all replaced and painted to match the new roof color.
-
5. Roof material is applied according to the
manufacture's specifications, and Uniform Building Code standards.
-
6. Upon completion clean up crews are dispatched,
and the premises are cleaned of debris.
-
New plywood and lumber is replaced when needed.


-
The contents of your garage is covered with
protective plastic sheeting.
-
(R) The roof is removed down to the spaced
sheathing, and new 30 LB. shake liner is applied.

-
After the shake liner is applied, workman
start at the eaves
-
with a starter course and work to the ridge
(High point of roof).

-
(R) Mike working in the front of the home
and (L) Kevin is positioning the new roof product according to the water
flow of this particular roof plane.
-
Working around the air conditioning system
and chimney
-
(note the new sky-light installed center).
-